INFILL DRILLING CONTINUES TO INTERSECT SEMI-MASSIVE TO
MASSIVE SULPHIDE ZONE AT ROCKLANDS SOUTH
NEW ZONE TO BE INCLUDED IN UPDATED RESOURCE ESTIMATE
CURRENTLY UNDERWAY
Unit 34, Brickworks Annex,19 Brolga Avenue, SOUTHPORT 4215
Phone: +617 5503 1955 Facsimile: +617 5503 0288
MARKET RELEASE 30th September 2013
ROCKLANDS COPPER PROJECT (CDU 100%)
Figure 1: Technical team conducting due diligence on behalf of international interests early last week, inspecting visible mineralisation
in diamond drill hole DODH478...accompanied by Peter Hutchison (Executive Director - 2nd from right).
Diamond Drill Hole DODH471 (gold results added)
Intersection 1
28m @ 3.70% CuEq
(from 237m)
Including
10m @ 8.47% CuEq
(from 240m)
Diamond Drill Hole DODH478 (gold results pending)
Intersection 1
11m @ 1.57% Cu
(from 208m)
Including
3m @ 5.20% Cu
(from 208m)
Intersection 2
29m @ 1.16% Cu
(from 225m)
Including
15m @ 1.98% Cu
(from 225m)
Including
4m @ 3.92% Cu
(from 225m)
And
3m @ 3.39% Cu
- Forums
- ASX - By Stock
- CDU
- pre-open
pre-open, page-2
-
- There are more pages in this discussion • 44 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)