I started to read the report.
A bit confused on some tonne numbers.
The report talks about 1.85 million tonnes of waste being the focus of mining and they specify some 105,000 tonnes that has ended up in the stockpile.
The ratio or ore stockpiled to the waste number looks out of whack compared to what I expected to see.
Any thoughts on theses numbers?