This makes me feeeling like a bingo winner!
South Africa: 1.500.000 ft³ (=42.000 m³) per day from six wells. And the best MPO had no drilling costs!!!
In such a case I always would preferre to produce such a field immeadetly.
MPO and MPO share holders are the lucky guys at the moment.