ETR 0.00% 0.7¢ entyr limited

pre_nr, page-3

  1. 7,333 Posts.
    lightbulb Created with Sketch. 171
    Citation Resources (ASX: CTR) is pleased to advise that the initial log evaluation has been completed by the
    Operator and Schlumberger following the detailed suite of electric logs run on the Atzam #4 well. The analysis
    of the logging data was completed in the Schlumberger head office in Mexico over the past week, with the key
    results of the analysis as set out in the table below.
    The analysis of the logging data confirmed the Atzam #4 well is 270ft high to the offset Atzam #2 well at the
    top of the C18 interval. The Operator has now successfully run production casing in the hole down the total
    depth of 4,050ft, with the casing now cemented in place in readiness for commencement of the well flow
    testing program. The testing program is now expected to commence in 2-3 weeks, following the mobilisation
    of the workover rig to site.
 
watchlist Created with Sketch. Add ETR (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.