HERON-2 WELL WEEKLY DRILLING REPORT – No 13
Key Points:
• Preparing to commence Epenarra production test
MELBOURNE, AUSTRALIA (January 18, 2007) -- MEO Australia Limited (ASX: MEO)submits this drilling report for the period ending 1000 hours, January 18, 2007. The Heron-2
well was spudded at 2230 hours (ACST) on October 12, 2007 in Exploration Permit, NT/P68.
The rig is preparing to commence the Epenarra Darwin formation production test. The 9⅝ inch production packer seal assembly has been set at 3075m just above facies C and the rig is currently making up the TCP (casing perforating) guns and running into the well with the test
string. It is expected that the 9⅝ inch casing will be perforated tomorrow morning and production testing of the facies C gas charged zones of the Epenarra structure will be undertaken.
Heron-2 is being drilled by Seadrill’s West Atlas jack-up rig contracted to MEO for two firm wells. The Heron-2 well is designed as a vertical well to penetrate and production test the Epenarra Darwin Formation and the deeper Elang/Plover Formation of the Heron North structure.
The Heron-1 well drilled by ARCO in 1972 intersected a 52m gas bearing column in the Darwin Formation (a fractured carbonate reservoir) within the 1,200 square km mapped
closure of the large Epenarra structure. Heron-1 also reached a gas charged zone in the deeper underlying Elang/Plover horizon, which is a secondary objective for the Heron-2 well.
- Forums
- ASX - By Stock
- MEO
- preparing to test tomorrow
preparing to test tomorrow
-
- There are more pages in this discussion • 15 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MEO (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
I88
INFINI RESOURCES LIMITED
Charles Armstrong, CEO & Managing Director
Charles Armstrong
CEO & Managing Director
SPONSORED BY The Market Online