Pre-feasibility study February through June 2010
Pre-feasibility work investigating bringing forward cash flow generation:
1. Potential for small scale power generation during pre-production phase (sell power into grid on a cash flow positive basis)and
2. Configuring power station into more than two stages Bankable feasibility study June through December 2010 Consultation with UCG Policy Scientific Committee 2H 2010 Detailed investigation of funding options (both local and off-shore) commenced in 2009 and continues
Pre-feasibility study February through June 2010 Pre-feasibility...
Add to My Watchlist
What is My Watchlist?