Epi, thats were I have been looking at that page 7 of the presentation and believe its likely to be that, except with upside ..
Nov 08 - NPAT $8m / 220m (ord + pref's) x PE 15 = 55c p/share
Jul 09 - NPAT $32m / 250m (ord + pref's) x PE 15 = $1.92 p/share
That's how I got my estimate of $2.00 for July 09 ..
Now lets build into that increased forward orders for the TOMSK production plant and Other Sales .. look at total on page 7, likely to be Dec 2010
Dec 10 - NPAT $880m / 250m (ord + pref's) x PE 15 = $52.80 p/share
This is only an estimate and we know the PE is variable based on sentinemnt & mgt, although I can say that IMO mgt have been conservative and strategic ... ethical or not ..
Show me the pine cones !!!!!
- Forums
- ASX - By Stock
- SLA
- presuming
presuming, page-2
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SLA (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
MTL
MANTLE MINERALS LIMITED
Nick Poll, Executive Director
Nick Poll
Executive Director
SPONSORED BY The Market Online