KRM 11.4% 3.9¢ kingsrose mining limited

price movement, page-14

  1. 116 Posts.
    I think maybe the firecracker will be the announcement of significantly increased reserves mentioned in a recent RNS. Production will be slower than originally hoped simply because these things always take longer than anticipated. Remember MMLs slow progress and a change in direction following floods etc, we are fortunate to have Bill Philips on board he has the experience to fast track this project safely and in an orderly manner. The company needs more ore body and this will be the sp driver afetr the initial revaluation.We also have the Sardinian lead zinc and silver tailings as another interesting opportunity although that is not in the sp and shouldn't be until all contracts are watertight etc. Sardinia??
 
watchlist Created with Sketch. Add KRM (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.