The tailing dam needed to be suited to the upcoming legislative changes due within the next year. As long as the plans met the narrative Im unsure what else may go wrong. It reminds me of any constructive work. You have legislative expectations to achieve and they are being checked as present via an authority. But youre right. Construction has its own headaches. But thats much further down the track.
The current tailing dam design is suited to withstand a seismic earthquake beyond scope ever seen in Greenlands history. So to be so sure of its capability to do the job. Lets hope that keeps the GoG happy.
- Forums
- ASX - By Stock
- ETM
- Price point once EIA is lodged
Price point once EIA is lodged, page-13
-
- There are more pages in this discussion • 8 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ETM (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.2¢ |
Change
0.001(4.76%) |
Mkt cap ! $30.99M |
Open | High | Low | Value | Volume |
2.2¢ | 2.3¢ | 2.2¢ | $3.686K | 163K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 347529 | 2.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.3¢ | 4540 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
5 | 347529 | 0.022 |
2 | 170000 | 0.021 |
2 | 847223 | 0.020 |
3 | 1370000 | 0.019 |
2 | 946590 | 0.018 |
Price($) | Vol. | No. |
---|---|---|
0.023 | 4540 | 5 |
0.024 | 300000 | 1 |
0.025 | 1115366 | 3 |
0.026 | 415000 | 2 |
0.027 | 211477 | 3 |
Last trade - 13.38pm 14/10/2024 (20 minute delay) ? |
Featured News
ETM (ASX) Chart |