NWH 1.14% $3.10 nrw holdings limited

Hi all, I thought it might be useful to start a Primero focus...

  1. 18,150 Posts.
    lightbulb Created with Sketch. 3763
    Hi all,

    I thought it might be useful to start a Primero focus thread as that division of NRW seems very active on multiple smaller projects that are not always updated by announcements.

    - it may give a sense of ‘what is going on out there’?


    For instance today Piedmont Lithium ( PLL ) - which owns potentially important US spodumene sites - announced its’
    [Scoping Study Presentation]

    Scroll to page 25 for the small print disclaimers
    The information in this presentation that relates to Process Design, Capital Costs, and Operating Costs is based on, and fairly represents, information compiled or reviewed by Mr. Alexandre Roy, a Competent Person who is a Registered Member of ‘Ordres des Ingenieurs du Quebec’, a ‘Recognized Professional Organization’ (RPO). Mr. Roy is a full time employee of Primero Group.
    Mr. Roy has sufficient experience that is relevant to the style of mineralization and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Mineral Resources and Ore Reserves’. Mr. Roy consents to the inclusion in this report of the matters based on his information in the form and context in which it appears.


    Here is a link to the Primero website which addresses the Piedmont Lithium project ;
    https://primero.com.au/projects/piedmont-lithium/
    See also
    [24/06/20 PIEDMONT APPOINTS PRIMERO GROUP AS PREFERRED EPC AND OPERATIONS CONTRACTOR]
    -which notes:​
    ….“Piedmont and Primero have partnered since early 2018 and Primero has been the lead engineering consultant for Piedmont’s scoping studies, concentrator design, and metallurgical testwork management.
    Building on this strong relationship, Piedmont and Primero have entered into the MOU to work together on an exclusive basis to agree binding documentation relating to the definitive feasibility study (“DFS” ), front-end engineering design, EPC delivery, commissioning, ramp-up and contract operations of the spodumene concentrator.”

    More on Alexandre Roy on [Linkedin]
    and
    https://primero.com.au/leadership-and-management/

    1654FBA4-9D61-44CF-A001-96298B51FA48.jpeg



    cheers
    Last edited by sabine: 10/06/21
 
watchlist Created with Sketch. Add NWH (ASX) to my watchlist
(20min delay)
Last
$3.10
Change
0.035(1.14%)
Mkt cap ! $1.402B
Open High Low Value Volume
$3.06 $3.12 $3.03 $4.067M 1.315M

Buyers (Bids)

No. Vol. Price($)
18 12454 $3.09
 

Sellers (Offers)

Price($) Vol. No.
$3.10 85582 35
View Market Depth
Last trade - 15.00pm 28/06/2024 (20 minute delay) ?
NWH (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.