My long-term intellectual interest in NWH is in the company moving up the value chain. That is, get into more sophisticated work like mineral processing plant (design, construct and maintain). A similar up-the-value-chain move applies to fields like road construction – that is take on more planning and design, plus more complex structures. This is why I have read with interest that Iluka has proposed a rare earths refinery at Eneabba north of Perth, which is estimated to cost $1.2 billion.
NWH does not have to get a significant slice of that Iluka action if it is not ready to do so. Designing and building refineries is one of the forward-looking paths down which NWH should be heading, and probably is heading. The connipsions of the current Big Dick of China is likely to encourage many mineral-processing initiatives in the rest of the world, and NWH must be ready to horn in on the action. As an aside, the FY20 Annual Report mentions Illuka – to wit, “DIAB Engineering undertook fabrication and construction of a gold processing plant for Northern Star, fabrication and construction of an ultra fines processing plant and the construction of a 6.5 kilometre conveyor system for Roy Hill, installation of a crushing circuit for a major lead/zinc producer Golden Grove and the construction of a screening/stacking plant for Iluka.” Also see https://www.iluka.com/getattachment/feff0353-8784-4dc9-a515-a887a27aeb7d/eneabba-rare-earths-refinery-%E2%80%93-letter-from-austral.aspx
- Forums
- ASX - By Stock
- NWH
- Primero focus
Primero focus, page-42
-
- There are more pages in this discussion • 96 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add NWH (ASX) to my watchlist
(20min delay)
|
|||||
Last
$3.45 |
Change
0.040(1.17%) |
Mkt cap ! $1.570B |
Open | High | Low | Value | Volume |
$3.43 | $3.46 | $3.41 | $3.524M | 1.023M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 17412 | $3.43 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$3.47 | 8204 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 11504 | 3.420 |
3 | 2504 | 3.410 |
1 | 1504 | 3.400 |
1 | 1504 | 3.390 |
2 | 4475 | 3.380 |
Price($) | Vol. | No. |
---|---|---|
3.480 | 1504 | 1 |
3.490 | 3354 | 2 |
3.500 | 76522 | 3 |
3.510 | 1522 | 1 |
3.520 | 1522 | 1 |
Last trade - 16.10pm 13/09/2024 (20 minute delay) ? |
Featured News
NWH (ASX) Chart |
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online