Hi guys,
Hoping somone with more drilling knowledge then me can advise (probably everyone)
What is the total TD for well 2
and also can we hit oil or a gusher before TD level? Or do we have to be at TD to conduct results and evaluate?
Should we be expecting an ann before TD of findings or is that not possible?
Thanks.