Indicated WA projects of 100GW renewable energy and 7 million tonnes of green hydrogen per annum by 2030 really puts PRL’s proposed 4GW Stage 1 upstream generation (plus 4GW Stage 2 later) and 550,000 tonnes per annum downstream GH2 into perspective. We are less than 10% but hopefully the most advanced (or possibly a close second to FFI). Government at all levels really needs to step on the accelerator and both the industry and key players must start applying more pressure particularly in Canberra.
- Forums
- ASX - By Stock
- PRL
- PRL Media/news
PRL Media/news, page-3458
-
- There are more pages in this discussion • 356 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add PRL (ASX) to my watchlist
|
|||||
Last
4.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $48.44M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
IGO
IGO kicks off earn-in copper drilling on-site Encounter's Yeneena play as it adopts new identity
MND
Monadelphous inks $200M contract with Woodside to help build Pluto LNG – but will it make Scarborough cheaper?
PRL (ASX) Chart |
Day chart unavailable