They can't export electricity to the SWIS as the transmission network only extends as far north as Kalbarri and if they were required to construction their own transmission network it would push a marginal at best concept well into the red.
- Forums
- ASX - By Stock
- PRL
- PRL Media/news
PRL Media/news, page-348
-
- There are more pages in this discussion • 3,455 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add PRL (ASX) to my watchlist
|
|||||
Last
4.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $48.44M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
PRL (ASX) Chart |
Day chart unavailable