ADL, I get the feeling that the equipment isn't yet on site because I think RLE would have announced that. I still think equipment will be on-site next week and flow rates a few weeks after that. I'm being conservative but RLE is making sure everything is done methodically.
What makes you think production tubing is in and ready for flow testing?