The fact that the problems relate to 'engineering and construction' means that things could be messy and expensive; imagine if, for example, some imbeci1e involved in the plant assembly has used the wrong type of rivets in putting together a significant part of the infrastructure and this problem was only detected when the plant was due to come online.
We'd be looking at some enormous delays and cost-overruns due to a couple of hundred bucks worth of incorrect materials!
The uncertainty and fact that they demonstrably lied to us was enough for me, I have now sold out of all of my 79,944 shares that I once held.
Enough rowing, I'm doing some swimming for a change.
S.
CMR Price at posting:
0.0¢ Sentiment: Buy Disclosure: Not Held