CLZ 0.00% 0.1¢ classic minerals ltd

PRODUCER IN 90 DAYS, page-65

  1. 1,743 Posts.
    lightbulb Created with Sketch. 379
    So they've dropped a few old tanks on site.
    Big deal.
    They are going to need atleast $100m to reach the stage of even filling them.
    Big civil job.
    Concrete pads with bunding, sumps and pumps for overflow. A grinding/mill circuit , cyclones, carbon column, all associated pipework and pumps. Power generation to run it all. A lab with qualified lab staff, ie; metalurgists. Steel work to support it all etc. Cyanide storage and dosing system.
    Just to mention a few hurdles to overcome.
    And it all needs to be fully compliant.
    More like 900 days rather than 90.
    Not gonna happen imo
 
watchlist Created with Sketch. Add CLZ (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.