Hi Rowingboat.
Yes, I was going from memory.
The measured and indicated was reported in December as 1.6m Oz
The resource was 2.1m Oz to which I added the 1m Oz from deeper and expanded pit. I guess this also includes Nakaferi which requires moving the village, which could well be an issue. It's also somewhat lower grade I think.
Your 2m Oz is the real number as the additional figure announced is in the range 500 to 1m Oz .
Hence 1.6 + 0.5 gives us the more realistic 2m figure.
But plenty of upside on ML yet !!
Thanks.
Griff
- Forums
- ASX - By Stock
- production and exploration
Hi Rowingboat.Yes, I was going from memory.The measured and...
-
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)