from ann released on 16/11/07
- Blackard grade 0.72%
- native copper ores recovery 64%
from AGM presentation released on 30/11/07
- mining cost $9.74 / tonne
- processing cost $9.35~9.83/tonne
so the apprx. cost to mine and process a tonne of ore would be $19.57
2200 lb/t x 0.72% x 64% = 10
and we can expect to extract 10 lb of copper from a tonne of ore.
19.57 / 10 = $1.957 / lb
it looks very disappointing. did i get it right? or have i misunderstood or made a mistake somewhere?
- Forums
- ASX - By Stock
- URL
- production cost over 2 dollar
production cost over 2 dollar
-
- There are more pages in this discussion • 6 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)