Hardly significant! 18 days of lost zinc production is $34.5 million US at zinc face value for metal, though it is postponed production.
As regards cost of repair, if it takes 18 days it must be a big job, you are not just replacing a fuse.
- Forums
- ASX - By Stock
- production interruption at century mine
ZFX
zinifex limited
Hardly significant! 18 days of lost zinc production is $34.5...
-
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)