production plans in place

  1. 7,468 Posts.
    lightbulb Created with Sketch. 770
    "Assuming successful delineation drilling, the development of the West Seahorse field is expected to
    be based on an unmanned monotower producing from a single well with the potential for add-on
    including Wardie-1. The well is expected to produce at an initial oil rate of 4,200 stb/day/well and
    decline harmonically. The field is expected to produce for ten years. The well fluid will be exported
    to an onshore processing plant via eight inch pipeline. The produced solution gas will be
    dehydrated, recompressed and piped (via 2.5 inch pipeline) to the monotower for gas lift. The
    onshore facility will include crude stabilization, water treatment, chemical injection and utilities."
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
15.5¢
Change
0.015(10.7%)
Mkt cap ! $51.68M
Open High Low Value Volume
15.0¢ 15.5¢ 14.0¢ $15.50K 103.3K

Buyers (Bids)

No. Vol. Price($)
1 7073 15.0¢
 

Sellers (Offers)

Price($) Vol. No.
15.5¢ 258970 4
View Market Depth
Last trade - 16.10pm 12/09/2025 (20 minute delay) ?
TDO (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.