If all are equal, the well should be position further away from the sealing faults to reduce the boundary effect on flowing pressure and in my opinion, putting the well as near the block boundary as possible (as regulation allows) is better.
- Forums
- ASX - By Stock
- JPR
- production testing kazakhstan style
production testing kazakhstan style, page-5
-
- There are more pages in this discussion • 10 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add JPR (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.9¢ |
Change
0.003(11.5%) |
Mkt cap ! $36.96M |
Open | High | Low | Value | Volume |
2.6¢ | 2.9¢ | 2.6¢ | $820 | 29K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 5000 | 2.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.2¢ | 100000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 5000 | 0.026 |
2 | 204963 | 0.025 |
1 | 25000 | 0.018 |
1 | 3056 | 0.016 |
1 | 10000 | 0.010 |
Price($) | Vol. | No. |
---|---|---|
0.032 | 100000 | 1 |
0.039 | 580000 | 1 |
0.045 | 22000 | 1 |
0.050 | 170354 | 2 |
0.055 | 35000 | 1 |
Last trade - 12.44pm 23/08/2024 (20 minute delay) ? |
JPR (ASX) Chart |
The Watchlist
SER
STRATEGIC ENERGY RESOURCES LIMITED
David DeTata, Managing Director
David DeTata
Managing Director
SPONSORED BY The Market Online