AVM 0.00% 2.0¢ advance metals limited

Anvil Mining Reports Record Net Incomeof $35.4 Million ($0.58...

  1. KKR
    1,217 Posts.
    lightbulb Created with Sketch. 433
    Anvil Mining Reports Record Net Income
    of $35.4 Million ($0.58 per share) for the Second Quarter 2007 and an Operating Profit of $43.1 Million
    on Concentrates Sales of $65.7 Million

    Montréal, Canada: Anvil Mining Limited (TSX, ASX: AVM), (“Anvil” or “the Company”) and
    including its subsidiaries (“the Group”) is pleased to announce record consolidated net income of
    $35.4 million ($0.58 per share on a weighted average number of shares basis) for the second quarter
    of 2007, compared to $22.5 million ($0.42 per share) for the second quarter of 2006. Concentrate
    sales also reached a quarterly record of $65.7 million, compared to $43.0 million for the
    corresponding quarter of 2006. Operating cash flow before working capital movements was a
    record $43.3 million ($0.71 per share), compared to $27.9 million ($0.50 per share) for the second
    quarter of 2006. Consolidated production for the second quarter totalled 8,395 tonnes of copper and
    583,269 ounces of silver contained in concentrates.
    Second Quarter Highlights

    • Quarterly production of 8,395 tonnes of copper and 583,269 ounces of silver contained in
    concentrates.

    • Record revenues from copper-silver and copper concentrate sales of $65.7 million, up 53%
    compared to the corresponding quarter of 2006.
    • Record net income of $35.4 million ($0.58 per share), up by 57% compared to the corresponding quarter of 2006.

    • Record operating profit (after depreciation and amortization) of $43.1 million up by 56%
    compared to the corresponding quarter of 2006.

    • Record cash flow from operating activities (before working capital movements) of $43.3
    million ($0.71 per share) up by 55% compared to the corresponding quarter of 2006.

    • Successful commissioning of the Stage I Heavy Media Separation (“HMS”) plant at Kinsevere with commercial production for the plant achieved in late June.

    • Completion of a bought deal equity financing for gross proceeds of C$201.2 million.

    Discovery of two new zones of oxide copper mineralization at Kinsevere and entering into
    an option to purchase two exploration licences in the Nambulwa region, located
    approximately 30 km north of the Kinsevere mine.
    • Appointment of Ausenco Limited (“Ausenco”) as the provider of engineering, procurement
    and construction management (“EPCM”) services for the Kinsevere Stage II development.
    • Cash and cash equivalents, including restricted cash, and investments in liquid assets of
    $284.2 million at the end of the quarter, equal to $4.03 per share.

    Bill Turner, President and Chief Executive Officer of Anvil, commented, “We delivered a strong
    financial performance for the second quarter of 2007 with quarterly records achieved for revenue,
    operating profit, net income and cash flow. Our strong financial performance was due to continued
    above-target operational performance at the Dikulushi mine and increases in realized copper and
    silver prices. We are proud to have produced the first copper concentrate from the recently
    completed HMS plant at Kinsevere in June and to have Ausenco Limited, a well-regarded
    international engineering firm from Australia, as the provider of the EPCM services for the
    Kinsevere Stage II development”.
    Outlook
    Above target production is being consistently achieved at the Dikulushi mine and with the
    commencement of commercial production at Kinsevere in June, the Company is still targeting
    approximately 50,000 tonnes (110 million pounds) of copper production for 2007.
    While improved production at the Kulu mine is expected in the second half of the year, the first
    semester production shortfall at Kulu will not be recouped by year-end and therefore it is estimated
    that the revised 2007 copper production target for Kulu will be 9,000 tonnes of copper compared to
    the original target of 15,000 tonnes. In order to improve metallurgical recoveries at Kulu, the
    Company will table a pre-feasibility study in the coming months with the aim of identifying the best
    option for reprocessing the coarse rejects/tailings and optimizing the value of the deposit, which is
    likely to involve Solvent Extraction Electro-winning (“SX-EW”) processing.
    The floats and tailings from the HMS operation, which are being stored in a retention dam for
    subsequent reprocessing, still average approximately 3% copper. Furthermore, the Kulu resource is
    a loose gravel which can be mined without the need for any waste stripping or drill and blast
    activities. It also has low gangue-acid consumption characteristics which support a simple wholeore-
    leach approach and SX-EW processing which is expected to achieve metallurgical recoveries of
    over 90%.
 
watchlist Created with Sketch. Add AVM (ASX) to my watchlist
(20min delay)
Last
2.0¢
Change
0.000(0.00%)
Mkt cap ! $2.708M
Open High Low Value Volume
2.0¢ 2.0¢ 2.0¢ $40 2K

Buyers (Bids)

No. Vol. Price($)
4 284547 2.0¢
 

Sellers (Offers)

Price($) Vol. No.
2.6¢ 240382 1
View Market Depth
Last trade - 10.23am 16/08/2024 (20 minute delay) ?
AVM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.