KAR 1.32% $1.87 karoon energy ltd

progress report 13

  1. 163 Posts.
    Wednesday, 30th December 2009
    (ASX Code: KAR)
    ASX ANNOUNCEMENT
    POSEIDON-2 PROGRESS REPORT NO 13
    At 0600 hrs WST today Karoon advises that the Poseidon-2 well was completing a wireline logging program.
    On completion of the wireline logging program, a 4-1/2 production liner will be run and cemented in
    preparation for production testing operations. Testing results will be advised as they become available over
    the course of the next few weeks.
    Since the last report the Transocean drilling rig re-manned, following cyclone evacuation, and wireline
    operations have been conducted.
    The Transocean Legend semi-submersible rig is drilling the exploration well, which is operated by
    ConocoPhillips.
    Poseidon-2 is located in WA-398, on the southern flank of the north-east trending structural high of the
    greater Poseidon structure. The objective of the well is to test the extent, presence and quality of reservoirs
    down-dip from Poseidon-1 where the Plover Formation is interpreted to thicken. The well had a planned total
    depth of approximately 5300 mRT.
    As with the recent gas discovery well, Poseidon-1, Poseidon-2 is planned to be plugged and abandoned
    following final well evaluation and production testing. These are exploration wells and are not suitable for
    production purposes.
    Equity interests of the participants in WA-398-P are:
    Karoon Gas (Browse Basin) Pty Ltd 40%
    ConocoPhillips (Browse Basin) Pty Ltd 60%
 
watchlist Created with Sketch. Add KAR (ASX) to my watchlist
(20min delay)
Last
$1.87
Change
-0.025(1.32%)
Mkt cap ! $1.498B
Open High Low Value Volume
$1.86 $1.87 $1.84 $8.261M 4.448M

Buyers (Bids)

No. Vol. Price($)
1 5493 $1.86
 

Sellers (Offers)

Price($) Vol. No.
$1.87 48154 5
View Market Depth
Last trade - 16.10pm 19/07/2024 (20 minute delay) ?
KAR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.