Just read the Balla Balla Project Summary and the project looks good. The low operating costs are very good and the forward long term contracts are a big plus.
With $73m cash I couldn't see how the capital cost was going to be funded ($850m).
The 25 year mine life and annual production with the slurry pipeline look good .
Does anyone have know details of the funding?
Add to My Watchlist
What is My Watchlist?