From todays ann aswell.
"Reprocessing of stock piled gold tailings with an average probable reserve grade of circa 0.71 grammes/tonne for an initial period of 3+ years."
With Gold at $1680/oz. 113300 oz of tailings also still sit at Windarra of which up to 85% can be recovered. So lets say 90,000 oz at $1680/oz. So $150 million give or take is just sitting there.
Is this an early cash flow they are looking at? If they stated it in the ann under the feasibility study it must be a possibilty they are looking into.
http://www.asx.com.au/asxpdf/20100216/pdf/31nqpyftrctrp0.pdf
- Forums
- ASX - By Stock
- project funding
From todays ann aswell."Reprocessing of stock piled gold...
-
-
- There are more pages in this discussion • 13 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add POS (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $21.01M |
Open | High | Low | Value | Volume |
0.5¢ | 0.5¢ | 0.4¢ | $20.95K | 4.192M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
66 | 64713594 | 0.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.5¢ | 963797 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
66 | 64713594 | 0.004 |
72 | 44974671 | 0.003 |
19 | 45427935 | 0.002 |
13 | 33778647 | 0.001 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.005 | 963797 | 4 |
0.006 | 34452433 | 37 |
0.007 | 5102781 | 18 |
0.008 | 3228468 | 8 |
0.009 | 548928 | 3 |
Last trade - 15.24pm 08/11/2024 (20 minute delay) ? |
Featured News
POS (ASX) Chart |
The Watchlist
EQN
EQUINOX RESOURCES LIMITED.
Zac Komur, MD & CEO
Zac Komur
MD & CEO
SPONSORED BY The Market Online