WKT 0.00% 9.9¢ walkabout resources ltd

Project information with Graphitic Schist iterations, page-615

  1. 2,544 Posts.
    lightbulb Created with Sketch. 983
    What a load of crap Spid. Why even have a rod mill or a secondary crusher if there is no value processing this material. An extra 50% built in plant capacity front and back end allows for any losses incurred. 40,000 tonne is a certainty. Only 30% if JORC compliant resource included in LOM calculation. No shortage of graphite at Lindi. The question is how far off 60,000 tonne will Lindi Jumbo produce annually. No Mpa ratings, no drum scrubber and no fresh material specifications Spid. You really are lacking.

    https://hotcopper.com.au/data/attachments/5852/5852029-d60d428df3c05e4117a028bee8c1651e.jpg

 
watchlist Created with Sketch. Add WKT (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.