Zadz: "The first thing i found is that there is another tailings deposit next to Las Lagunas called Mejita which is much larger (49Mt) but of much lower grade and of oxide ore tailings."
First it is of lower grade. Secondly it is oxide tailings not refractory. Both not suitable for LL Albion plant.
"The second thing i found is that the Las lagunas tailings could be larger than the current project estimates."
No one can truly estimate the exact tonnage of any tailing dam. It could be higher, it could be lower. The same applies to grades of the tailings
"you will see that instead of the 5.137Mt of ore as is the official estimate, there is likely more like 6.23Mt and possibly even a little more. This would extend the project life from 6.5 yrs to 7.8 years. A significant increase!
So i think that although it's stating the bleeding obvious, there is indeed plenty of time to extend the useful life of the LL plant."
I wish I can share your sentiment. I like to place my optimism on facts and numbers, not on speculation.
- Forums
- ASX - By Stock
- AAU
- project life
project life, page-2
-
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AAU (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.4¢ |
Change
0.000(0.00%) |
Mkt cap ! $7.422M |
Open | High | Low | Value | Volume |
0.4¢ | 0.4¢ | 0.4¢ | $1.649K | 450K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
69 | 65381850 | 0.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.4¢ | 53426086 | 26 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
59 | 47480185 | 0.003 |
49 | 66925069 | 0.002 |
14 | 69999950 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.004 | 53426086 | 26 |
0.005 | 15677995 | 10 |
0.006 | 7117660 | 7 |
0.007 | 1055918 | 2 |
0.008 | 4500000 | 3 |
Last trade - 14.34pm 18/10/2024 (20 minute delay) ? |
Featured News
AAU (ASX) Chart |