For bulk Carriers needed for the Iron trade, ports will have to have at least 17 metres of water, preferable 20 metres plus to cope with ships to China. Doula has 8.5 metres of water. That gives a ship fully loaded of about 25,000 tonnes DWT. Not good enough.
Nextport
- Forums
- ASX - By Stock
- project location and potential
For bulk Carriers needed for the Iron trade, ports will have to...
-
- There are more pages in this discussion • 42 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LEG (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.2¢ |
Change
0.000(0.00%) |
Mkt cap ! $34.91M |
Open | High | Low | Value | Volume |
1.4¢ | 1.4¢ | 1.2¢ | $5.046K | 360.9K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 301591 | 1.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.4¢ | 1920566 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 301591 | 0.012 |
8 | 1674339 | 0.011 |
10 | 1275936 | 0.010 |
5 | 1781211 | 0.009 |
2 | 1370000 | 0.008 |
Price($) | Vol. | No. |
---|---|---|
0.014 | 1920566 | 4 |
0.015 | 1059200 | 4 |
0.016 | 870075 | 5 |
0.017 | 800000 | 1 |
0.018 | 338000 | 1 |
Last trade - 16.10pm 18/10/2024 (20 minute delay) ? |
Featured News
LEG (ASX) Chart |