If true, would mean last results won't come back from the lab 7 weeks from here or approximately somewhere between 5th-9th April. With that info, I'd say the Board would want to get confirmation of results to progress the project to the next stage rather than lose 1.5 months waiting for all results. Investors for sure don't like waiting either.
- Forums
- ASX - By Stock
- Projects: GOLD/HALLOYSITE/LITHIUM/COPPER/HEAVY METALS
If true, would mean last results won't come back from the...
-
- There are more pages in this discussion • 362 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LRS (ASX) to my watchlist
|
|||||
Last
14.0¢ |
Change
-0.005(3.45%) |
Mkt cap ! $391.9M |
Open | High | Low | Value | Volume |
14.5¢ | 14.5¢ | 13.5¢ | $1.358M | 9.893M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
14 | 1825352 | 13.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
14.0¢ | 798256 | 10 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
14 | 1825352 | 0.135 |
32 | 3229745 | 0.130 |
16 | 553548 | 0.125 |
12 | 1159182 | 0.120 |
3 | 456350 | 0.115 |
Price($) | Vol. | No. |
---|---|---|
0.140 | 798256 | 10 |
0.145 | 293078 | 5 |
0.150 | 1019589 | 14 |
0.155 | 985333 | 9 |
0.160 | 1435836 | 14 |
Last trade - 16.10pm 30/07/2024 (20 minute delay) ? |
Featured News
LRS (ASX) Chart |
The Watchlist
MTL
MANTLE MINERALS LIMITED
Nick Poll, Executive Director
Nick Poll
Executive Director
SPONSORED BY The Market Online