Hi Pelican,
The answer is probably "there is still some optimisation that is occuring" with the potential Joint Venture partner hahaha.
At least now I can see that there is a Bankable Feasibility study being conducted. At one stage I thought the BFS was a fake and NKP management was using the money for their on pleasure.
Does it say anywhere the CAPEX? I cannot be bothered to read all 187 pages
- Forums
- ASX - By Stock
- proposed garatau platinum mine
Hi Pelican, The answer is probably "there is still some...
-
-
- There are more pages in this discussion • 6 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)