Here's a pro, there is already 104 900 tonne of material sitting on the ROM with an average grade of 4.8% cu eq and if we keep this up we will produce the equivalent copper using a resource of 1.7 cu eq in 4.25 months instead of 12 months. Even if they mine an average grade of 1.7% from here on in we will still shave 20 days off that 12 month's.
Looking at an announcement from 2010 I added up the average of 13 holes I know were drilled in Las Mineral, all started from surface and the average was 130 metres at 3.54% cu eq.
Add to My Watchlist
What is My Watchlist?