Hi NT84
I think statements in KDR’s 12/03/2013 announcement like ‘The true width of the HRC036 intercept is estimated between 10-15m but further infill drilling is required to delineate this zone.’ are worth noting. Also the fact that HRC036 and HRC037 look to be within 25m of each other and have big variations in grades. They seem to be narrowing in on the high grade areas and it will be interesting to see the rest of the assays.
Hi NT84I think statements in KDR’s 12/03/2013 announcement like...
Add to My Watchlist
What is My Watchlist?