Jocam - I'm was under the impression that the drilling HZN...

  1. 145 Posts.


    Jocam - I'm was under the impression that the drilling HZN refered to in their slides relates to follow up drilling and perhaps dare I say it "apprasial" drilling related to this Permit rather then the H-1 sidetrack. I'll check this. Both HZN & PCL and others are acutely aware of the shareholder "frustration" with H-1 as it stands. I understood that subject to the JV Meeting they would be looking at getting a workover rig to site ASAP.
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.