JPR 8.00% 2.7¢ jupiter energy limited

prospectus, page-19

  1. 23,992 Posts.
    lightbulb Created with Sketch. 2
    re: buyers back I only managed 50,000 Denum, but I'm back in the Q for another 50,000 - I was trying to alter my order and make it for more when it went through and then cotik shot in front of me!!
    What a bloody bargain - wish I'd got more.
    And who keeps jumping my oppie order? Come on - sell me your opppies folks!!
    riffraff (?) - other than the fact that it's a shocking nic(!!!) there's plenty of reading to show the offer upcoming. I'll paste their last update ann here - but it's an absolute no brainer imo..

    04 September 2006
    Update on Biodiesel Activities
    The Board of Jupiter Energy Limited (ASX: JPR) (Jupiter Energy) is pleased to provide
    shareholders with a further update on the progress of its planned Malaysian based
    biodiesel project.
    As already outlined in earlier shareholder announcements, there are a number of key
    milestones that the Board has been focused on achieving in recent months. Broadly
    speaking these can be categorized as follows:
    • Plant Location
    • Plant Technology
    • Balance of Plant Contractor
    • Supply of Feedstock
    • Government Licences
    • Corporate Activities
    This announcement will outline the progress made in each of these areas.
    Plant Location
    Jupiter Energy, through its 100% owned Malaysian subsidiary Jupiter Biofuels Sdn Bhd
    (Jupiter Biofuels), has now signed a 30 year lease with the Kuantan Port Authority to
    lease a total of approximately 8.75 hectares (21.62 acres) of land in Kuantan. Kuantan
    Port is an all weather, deep sea port and has significant existing infrastructure in terms of
    petro-chemical and palm oil process plants; bulk liquid cargo storage and liquid berth
    terminals and is located on the east coast of the Malaysian Peninsula and will be the site
    of the proposed biodiesel facility. This quantum of land will enable Jupiter Biofuels to
    extend its processing capacity beyond the initial plant size as and when the Board
    determine that it is financially prudent to do so and when the necessary approvals have
    been granted. The entry into the lease is subject to the obtaining of two standard
    regulatory approvals within 90 days. Jupiter Biofuels has no reason to believe these
    conditions will not be satisfied within the requisite time frame.
    Plant Technology
    Jupiter Biofuels has signed a contract with the European based biodiesel technology
    provider, Desmet Ballestra Oleo (Desmet), to acquire a 250,000 Tonnes Per Annum
    (TPA) biodiesel plant to be built in Kuantan. This is equivalent to an annual production
    of some 280 million litres of biodiesel when running at full capacity. The equipment for
    the plant shall be delivered progressively between seven (7) and nine (9) months from the
    date of the initial payment.
    Desmet was founded in 1946 and currently employs over 600 people, located in offices in
    17 countries. Desmet has built 5,700 plants in 148 countries around the world. Desmet
    has an annual turnover of Euro 250 million and is one of the leaders in terms of the
    manufacture and commissioning of biodiesel plants.
    Desmet has provided warranties in relation to the quality of the equipment to be supplied
    and the performance of that equipment. The equipment warranty covers any breaches in
    the quality of the equipment supplied in the twelve (12) months following start-up of the
    biodiesel plant. Under the performance warranty, Desmet will perform all appropriate
    services to correct any defect in performance that is caused by Desmet. The maximum
    liability of Desmet under the agreement is limited to an amount of 5% of the value of the
    agreement.
    The agreement is conditional upon Jupiter Biofuels Limited listing on ASX.
    Balance of Plant Contractor
    Jupiter Biofuels has also signed a contract with SMEC (Malaysia) Sdn Bhd to Engineer,
    Procure, Construct and Manage (EPCM) the Balance of the Plant. The Balance of Plant
    covers all the other key elements to the construction phase including site works; the tank
    farm; civil and structural works; mechanical; piping and electrical works; office
    buildings; service buildings and other key utilities. The agreement is for a term of
    seventeen (17) months and is otherwise on ordinary commercial terms.
    The agreement is conditional upon Jupiter Biofuels Limited listing on ASX.
    Feedstock Supply
    Jupiter Biofuels has signed agreements with Ditali Sdn Bhd for the supply of crude palm
    oil feedstock and refined palm oil to the plant. The contracted quantity will be sufficient
    to fully support the plant being built in Kuantan and the arrangements will allow for
    additional supply if and when Jupiter Biofuels considers increasing its production
    capacity.
    Government Approvals
    As previously announced, Jupiter Biofuels has received its licence from the Malaysian
    Industrial Development Authority (MIDA) to build the biodiesel plant and has now also
    received confirmation that it has been granted tax pioneer status which will exempt 100%
    of Jupiter Biofuels operating income from taxation in Malaysia for an initial period of
    five (5) years from the date of commencing commercial operations.
    No other approvals are currently outstanding in terms of what will be required to satisfy
    the requirements of proceeding to an Initial Public Offering of Jupiter Biofuels Limited.
    Corporate Activities
    As shareholders are aware, the Board of Jupiter Energy will be seeking shareholder
    approval to spin off the biodiesel project held within Jupiter Biofuels Limited via an in
    specie distribution of shares.
    A meeting of Jupiter Energy’s shareholders will be called to consider and vote on the
    proposed in specie distribution. For this purpose, a Notice of Meeting will be sent to
    Jupiter Energy shareholders and this will contain all information required by shareholders
    to form an opinion on how to vote. The Notice of Meeting is expected to be dispatched
    in late September for a meeting to be held in late October 2006. There has been a delay of
    a few weeks from the original timetable due to the need to conclude all contracts to the
    full satisfaction of the JPR Board and its advisors.
    Jupiter Biofuels Limited will issue a Prospectus to raise the required capital to fund the
    construction of the plant in Kuantan and the necessary working capital. The Jupiter
    Biofuels Limited Prospectus is expected to be lodged with the ASIC and ASX in mid
    September 2006 and it will be seeking to raise A$75 million via the issue of 150 million
    shares at an issue price of $0.50 per share. The Prospectus will be based on Jupiter
    Biofuels Limited having an implied value of $40 million (ie 80 million shares) prior to
    the capital raising. Of the $75 million to be raised via the Prospectus, $5 million will be
    invested by Jupiter Energy and the 10 million shares will be held in Jupiter Energy under
    a mutually agreed voluntary escrow arrangement. Based on the $40 million implied
    valuation, the conversion rate from Jupiter Energy shares to Jupiter Biofuels Limited
    shares will be approximately 1 for 1.875.
    This ratio is based on the capital structure of Jupiter Energy as at the Record Date being,
    in round figures:
    • Total number of Jupiter Energy fully paid shares: 150,000,000
    • Total number of Jupiter Biofuels Limited shares via the in specie distribution;
    80,000,000
    • Conversion Rate (150,000,000/80,000,000) = 1.875
    The 150,000,000 fully paid shares assumes that by the Record Date all 8 cent and 20 cent
    options currently on issue are exercised, that Executive Director Geoff Gander exercises
    all 5 million of his 12 cent options and that Petro Technology Australia exercises 1.75
    million of its 12 cent options. Any variation to this would mean a variation in the number
    of fully paid ordinary Jupiter Energy shares on issue as at the Record Date.
    It is important to remind all Jupiter Energy option holders that they MUST convert their
    options to shares in order to participate in the in specie distribution of Jupiter Biofuels
    Limited. This conversion must happen by 31 October 2006 although the Board suggests
    that option holders submit their application monies earlier than this date to ensure there
    are no potential delays in the conversion process. A timetable is attached below to
    provide both shareholders and option holders with more information on the timing of the
    transaction. A letter will also be sent to all Jupiter Energy option holders in the next
    fortnight notifying them of the requirement to exercise their options in order to
    participate in the in specie distribution.
    The Jupiter Energy Board is also delighted to announce that the following new Directors
    have agreed to join the Jupiter Biofuels Limited Board as it prepares for its Initial Public
    Offering. These additional Board members are:
    Richard Beresford (Independent Non Executive Director)
    Richard Beresford has over 23 years of experience in the international energy business
    (predominantly natural gas and renewables) spanning research, technology
    commercialisation, strategic planning, operations, consultancy, business development,
    capital raising, acquisitions, marketing and general management. Richard has had direct
    participation in the development of a broad cross-section of renewable and clean energy
    technologies and applications including fuel cells, wave power, PV, bioenergy and highefficiency
    natural gas processes. Richard is experienced in corporate roles having served
    as a director of 2 listed companies including 1 as Chairman. He is also a Fellow of the
    Australian Institute of Company Directors and a Fellow of the Australian Institute of
    Energy.
    David Quinlivan (Independent Non Executive Director)
    David Quinlivan is a mining engineer with almost 30 years experience on projects
    throughout the world. David is familiar with all aspects of resources development from
    grass roots exploration through to bankable feasibility reviews and detailed mining
    programs. He recently oversaw (as a project management consultant) the expansion of
    the Perseverance Deeps nickel mine in Western Australia for BHP Billiton. He has just
    completed an assignment assisting the Administrators with the operation and corporate
    reconstruction of Sons of Gwalia Ltd.
    David is a Fellow of the Australian Institute of Mining and Metallurgy, Member of the
    Australian Institute of Arbitrators & Mediators Australia and an Associate of the
    Securities Institute of Australia. He is also a non-executive director of ASX-listed gold
    explorer Avoca Resources Ltd and Chairman of the AIM listed resources company
    Churchill Mining Plc.
    In addition, the Jupiter Biofuels Limited Board will also be made up of Eddie Smith,
    Geoff Gander, Geoff Clifford, and Dato’ Captain Sufian. Details of these gentlemen were
    outlined in an announcement made to shareholders on July 26, 2006.
    The following indicative timetable outlines the important dates that shareholders and
    option holders need to be aware of, however these dates are indicative only and may
    change.
    INDICATIVE TIMETABLE
    Lodgement of Jupiter Biofuels Limited Prospectus with the
    ASIC
    15 September 2006
    Availability of Printed Prospectus 27 September 2006
    Despatch of Notice of Meeting to approve the in specie
    distribution with a copy of the Prospectus attached
    27 September 2006
    General Meeting of Shareholders 30 October 2006
    Final date for exercise of JPR options into shares * 31 October 2006
    Trading in Jupiter Energy Shares starts on “ex return of
    capital basis”
    31 October 2006
    Record Date on which the in specie distribution will be
    based
    5.00pm WST on 6 November 2006
    Closing Date of Jupiter Biofuels Limited Prospectus ** 5.00pm WST on 15 November 2006
    Despatch of Holding Statements 20 November 2006
    Trading of Shares on ASX expected to commence 23 November 2006
    * The Board of Jupiter Energy recommends that shareholders send application forms for the exercise of options to
    the share registry by 15 October 2006 to avoid any potential for options not to be converted by the Record Date
    ** This date may change at the discretion of the Jupiter Biofuels Limited Board.
    We trust shareholders and option holders now have a better understanding of the timing
    of the proposed transaction.

 
watchlist Created with Sketch. Add JPR (ASX) to my watchlist
(20min delay)
Last
2.7¢
Change
0.002(8.00%)
Mkt cap ! $34.41M
Open High Low Value Volume
2.7¢ 2.7¢ 2.7¢ $7.84K 290.3K

Buyers (Bids)

No. Vol. Price($)
1 383809 2.6¢
 

Sellers (Offers)

Price($) Vol. No.
3.9¢ 444000 1
View Market Depth
Last trade - 10.04am 04/10/2024 (20 minute delay) ?
JPR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.