From Page 6 of 'UMC.pdf':
The transport options under consideration include:
o
165 km road transport (using existing roads) to the FMG rail line
o
6 km constructed rail loop and spur within tenement E47/1429 to Rio Tinto’s West Angelas rail line
o
50 km road upgrade and transport to Rio Tinto’s West Angelas