NRZ 10.0% 1.1¢ neurizer ltd

Sorry for the terse statement fellows,but I was just too damned...

  1. J L
    1,696 Posts.
    lightbulb Created with Sketch. 164

    Sorry for the terse statement fellows,but I was just too damned tired. I am trying to gauge investor sentiment to have a punt at establishing an entry level. I cop a fair bit of shite from time to time, and sometimes it tests my enthusiasm to put ideas for debate. I do not hate this stock, I believe in its success, but am apprehensive about fair value.


    So, here goes. I have based my analysis on the last 5B, the two interviews, and the analysist’s report which was commissioned by and promoted by LCK.


    “Given new hires and a step up in workassociated with Stage 1 and Stage 2 progression we have assumed corporatecosts will move up to ~A$10m in the medium term.”


    $2.5 million perQuarter
    (Currently $2.077 Million)


    “We forecast ~A$25m will be requiredto fund a number of gasification wells, associated production plant and thepurchase of a small power plant (up to 5 Megawatt (MW)) to demonstrate projectproof of concept.”


    Stage 1 along with Off-takes to becompleted by end of year. (Interview)


    The $25.0 million will be requiredwell in advance of Christmas. Tapping Off-take advances will not be available before Agreements signed. Timing unsure.

    “We estimate that for a scope of worklike this, the engineering company will typically be paid ~1.5% - 2.0% of theforecast project cost. Based on a forecast LCEP construction capitalexpenditure number of A$2.25b, this equates to

    A$34m – A$45m. This would likely besplit:


    15% on signing (A$5m – A$7m),FY22” (say $6.00 million atsigning HOA)


    Total expenditure by, say, November2021 estimated at:


    $2.5X2 million +$25.0 million +$6.0 million = $36 million


    On a linear scale this would be $18.0million per Quarter, but in reality Quarter 3 expenditure would be greater thanQuarter 4 because of initial HoA fees.


    Appendix 5B – 30 March 2021 we haveapprox. $7.599million (including first tranche of approx. $6.0 million)

    At30 June 2021 we will have approx. ($7.599 - $2.077) = $5.5 million excluding any extra costs.

    We now potentially have $5.5 m +($12.0 million i.e. tranches 2 and 3) = $17.50 million to be partially achievedbefore end of June.


    This $17.50 million will struggle toget us to end of Quarter 3. Extra funding (CR??) will be required or insolvency.

    A bit **bled but I have dashed it up ina hurry, and mainly from memory. Please scrutinise it carefully for defects. J L.

 
watchlist Created with Sketch. Add NRZ (ASX) to my watchlist
(20min delay)
Last
1.1¢
Change
0.001(10.0%)
Mkt cap ! $20.92M
Open High Low Value Volume
1.0¢ 1.3¢ 0.9¢ $112.0K 9.997M

Buyers (Bids)

No. Vol. Price($)
2 206728 1.1¢
 

Sellers (Offers)

Price($) Vol. No.
1.2¢ 85000 1
View Market Depth
Last trade - 16.10pm 09/07/2024 (20 minute delay) ?
NRZ (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.