The article said 200m was a good usable head height and the Kalgoorlie super pit is nearly 600m deep and 3.5km x 1.5km. All they need to do is dig out and line the top tank/s and run the pipes down to the turbines, generators and pumps.
Maybe have that equipment lowered down on steep tracks with cables so they can raised and lowered to suit water levels and for maintenance?
- Forums
- Science & Medicine
- Pumped Hydro Energy Storage across Australia
The article said 200m was a good usable head height and the...
- There are more pages in this discussion • 92 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Featured News
The Watchlist
BPH
BPH ENERGY LTD
David Breeze, MD & Executive Chairman
David Breeze
MD & Executive Chairman
SPONSORED BY The Market Online