Snatcher-2 is planned to be drilled to a revised measured total depth of 1,900 metres.
Drilling reports will be provided to the ASX on a weekly basis and as significant events
occur.
- Forums
- ASX - By Stock
- ITC
- put another log on da fire
put another log on da fire, page-9
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)