Snatcher-2 is planned to be drilled to a revised measured total depth of 1,900 metres.
Drilling reports will be provided to the ASX on a weekly basis and as significant events
occur.
Snatcher-2 is planned to be drilled to a revised measured total...
Add to My Watchlist
What is My Watchlist?