BHP quit the farm in for Elliott Copper project see announcement 30/11/23. There was an announcement on drilling results on the IGO farm in on 5/3/24. Drilling was supposed to be completed late November for Sandover (Encounter got a 200k NT grant) so results should be due. Carrara farm in with South 32 was drilling with it suppose to have finished in November so results due any time.
A drilling campaign is about to start in April in West Arunta. That should positively move the dial on the share price and hopefully the Sandover and Carrara results are positive as well.
- Forums
- ASX - By Stock
- ENR
- Puzzled
Puzzled, page-4
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ENR (ASX) to my watchlist
(20min delay)
|
|||||
Last
48.5¢ |
Change
-0.035(6.73%) |
Mkt cap ! $219.1M |
Open | High | Low | Value | Volume |
53.0¢ | 53.0¢ | 48.5¢ | $284.5K | 562.0K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 188 | 48.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
51.5¢ | 18008 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 188 | 0.485 |
4 | 21500 | 0.480 |
3 | 45736 | 0.475 |
2 | 65236 | 0.470 |
2 | 40000 | 0.465 |
Price($) | Vol. | No. |
---|---|---|
0.515 | 18008 | 1 |
0.520 | 16600 | 2 |
0.530 | 20929 | 2 |
0.545 | 5000 | 1 |
0.550 | 20309 | 2 |
Last trade - 16.10pm 14/08/2024 (20 minute delay) ? |
Featured News
ENR (ASX) Chart |