PYC 2.70% 19.0¢ pyc therapeutics limited

thanks SoT.Project risk runs high when we fall behind schedule,...

  1. 932 Posts.
    lightbulb Created with Sketch. 177
    thanks SoT.

    Project risk runs high when we fall behind schedule, in this case overtaken by comeptitors. A key reason why I took part in the 17c raise back in Oct 20 was due to the CNS potential.

    I’m glad some have made it through, but still crushed that we couldn’t file the showstopper ALS lead IP documents earlier, Sahm had talked about it throughout 2021, saying it was weeks away during the US investor roadshow.

    from Oct 2020 cap raise presentation

    https://hotcopper.com.au/data/attachments/4193/4193897-f888cbe57f87d98c6ea7226f01d2c8f3.jpg

    from AGM Nov 20 outlining multiple high value CNS leads

    https://hotcopper.com.au/data/attachments/4193/4193906-1524d5607e34310d0d9c6a47a4bc568a.jpg
 
watchlist Created with Sketch. Add PYC (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.