Morris Creek 24 hole rc and diamond drill results for areas 1 and 2 are pending.
The drill programme was flagged to begin in early November in the 30 October quarterly. In the Managing Director's progress report of 17 December it was stated that the Morris Creek drill programme was underway and that they were awaiting results (they were still drilling diamond holes at that date due to some delays).
The MD also said that they had intersected the targeted breccia zones on all the rc and diamond holes there and that those breccia zones range from about 20m to 40m wide (but didn't give any indication of whether Cu and Au was intersected).
Cheers
SBC