The construction of the Lava Blue demonstration plant was almost completed 6 months ago, no news since.
Looking back over a few announcements.
The leaching circuit has been reduced from 6 to 4 hours.The test work is looking at counter current leaching. The nitric acid concentration has been reduced from 2.5 tonne per 1 tonne of ore to 1.8 tonne of acid a reduction of 28%.The acid will run at 56% concentration in the leach circuit, so this will be a big saving of solution requiring heating, less water and GAS.
The iron hydrolysis test work is looking at raising the pressure in the tanks to 10 bar, again this will reduce GAS consumption.The iron hydrolysis line is the biggest user of gas.
- Forums
- ASX - By Stock
- QPM General Discussion Thread
The construction of the Lava Blue demonstration plant was almost...
-
- There are more pages in this discussion • 1,548 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add QPM (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.8¢ |
Change
0.001(2.70%) |
Mkt cap ! $95.80M |
Open | High | Low | Value | Volume |
3.8¢ | 3.8¢ | 3.7¢ | $54.51K | 1.436M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
7 | 1412895 | 3.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.9¢ | 1985621 | 9 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
7 | 1412895 | 0.037 |
7 | 3371949 | 0.036 |
6 | 307856 | 0.035 |
4 | 295303 | 0.033 |
7 | 766719 | 0.032 |
Price($) | Vol. | No. |
---|---|---|
0.039 | 1785621 | 8 |
0.040 | 856446 | 11 |
0.041 | 165467 | 3 |
0.042 | 571685 | 3 |
0.043 | 524776 | 3 |
Last trade - 15.52pm 18/10/2024 (20 minute delay) ? |
Featured News
QPM (ASX) Chart |