"The results from the remaining ten RC holes have not yet been received. The delay is a result of internal procedures and is not indicative of the turnaround time for assays which under normal circumstances should be approximately 4 to 6 weeks. The company has corrected these procedures and doesn’t expect this to be ongoing problem in future drilling programmes. Furthermore because the company utilises handheld XRF analysis final chemical assay results are not required operationally as the company gets instant feedback at the time of drilling that is accurate enough for ongoing planning. The final chemical analysis using a certified laboratory are required for the calculation of JORC resources."
That answers that little issue. So all good, shouldn't be too much longer... And the details of the gold JV look a lot juicier than I had thought.
Think this will shoot back up next week, if we aren't already in a TH 1st thing. Exciting times ahead.
- Forums
- ASX - By Stock
- qr
"The results from the remaining ten RC holes have not yet been...
-
- There are more pages in this discussion • 22 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GTE (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.1¢ |
Change
0.003(10.7%) |
Mkt cap ! $17.15M |
Open | High | Low | Value | Volume |
2.8¢ | 3.1¢ | 2.8¢ | $8.509K | 275.8K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 998082 | 2.9¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.1¢ | 68601 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 998082 | 0.029 |
1 | 500000 | 0.028 |
1 | 186243 | 0.027 |
2 | 154000 | 0.026 |
4 | 2271000 | 0.025 |
Price($) | Vol. | No. |
---|---|---|
0.031 | 68601 | 2 |
0.034 | 97802 | 2 |
0.035 | 201657 | 2 |
0.036 | 81081 | 1 |
0.037 | 89991 | 1 |
Last trade - 15.34pm 18/11/2024 (20 minute delay) ? |
Featured News
GTE (ASX) Chart |