They still seem to have enough dosh to have management and senior personnel to travel to various destinations though! =) Tough times.
I never expected Tanzania project to be on schedule either with Aminex as lead operator. They're English! Slow and steady as usual, but more slow than steady.
Either way, it still remains a "bottom-drawer" for me James21, with potential multi-bagging in the near future (by near I mean 1-2 years). =)
- Forums
- ASX - By Stock
- KEY
- qtrly out
qtrly out, page-3
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add KEY (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $2.262M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
KEY (ASX) Chart |
Day chart unavailable