They still seem to have enough dosh to have management and senior personnel to travel to various destinations though! =) Tough times.
I never expected Tanzania project to be on schedule either with Aminex as lead operator. They're English! Slow and steady as usual, but more slow than steady.
Either way, it still remains a "bottom-drawer" for me James21, with potential multi-bagging in the near future (by near I mean 1-2 years). =)
- Forums
- ASX - By Stock
- qtrly out
They still seem to have enough dosh to have management and...
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add KEY (ASX) to my watchlist
|
|||||
Last
0.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $2.262M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
TLX
Telix jumps 11.6% as US government indicates proposed medicare changes won't affect prostate cancer drug
RNU
Renascor wins a funding boost given it wants to produce a critical mineral – but $5M award pales in comparison to some
KEY (ASX) Chart |
Day chart unavailable