CFU 0.00% 0.4¢ ceramic fuel cells limited

The turbine is rated at 30kW but futher on in the article it...

  1. 336 Posts.
    The turbine is rated at 30kW but futher on in the article it states that "The plant currently operates from 7am until 11pm, Monday to Friday. The microturbine generates about 23kW of electricity daily." Which doesn't make sense

    Also the article does not provide the thermal and electrical efficiencies.

    kWh are a bit of a nonsensical measure as 1 Watt equals 1 Joule per second. So 1kWh equals 1000 joules per second over an hour or 3,600 kilojoules
 
watchlist Created with Sketch. Add CFU (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.