SO4 0.00% 31.0¢ salt lake potash limited

pecs jorc is almost ready. this is a massive achievement. we...

  1. 884 Posts.

    pecs jorc is almost ready. this is a massive achievement. we could get about 15-20 m pounds. underground mine is a big downside though.

    however, bison basin and sweetwater are running behind schedule. bison jorc was meant to be completed by the end of june, now the target is july. sweetwater jorce was also meant to be completed by end of june and now the target is quarter 3 2007.

    also, i thought scoping study for bison basin was meant to start in may. the table says q 3-4 2007. not sure if then is when it will start or finish.

    these delays are unacceptable. management needs to really get their head in the game if they're going to get the sp out of this rut.
 
watchlist Created with Sketch. Add SO4 (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.