Hi zzedzz,
Figure 11 in the Quarterly states approx. 600,000 tonnes of the 12 long-term stockpiles currently building at Rocklands.
8 long-term stockpiles = 600,ooo tonnes
12 long-term stockpiles = 900.000 tonnes on average.
In addition, a number of weeks trucking of ore to stockpiles can be added since the photo was taken. There is also the ore that has been blasted awaiting collection and stockpiling.
chees
max
- Forums
- ASX - By Stock
- CDU
- quarterly out
quarterly out, page-66
-
- There are more pages in this discussion • 75 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)